ABSTRACT

A single mistake, whether made during the bidding process or when executing a construction project, can potentially cost tens of thousands of dollars or more. Of course, the sooner mistakes are caught, the less costly they become. Based on the authors' combined experience working on projects large and small, Construction Management: Subcontractor S

chapter |2 pages

Module One

chapter 1|4 pages

Demolition*

chapter 2|14 pages

Shoring and Underpinning*

chapter 3|8 pages

Mass Excavation and Site Grading*

chapter 4|10 pages

Dewatering*

chapter |4 pages

Questions—Module One (Chapters 1–4)

chapter |2 pages

Module Two

chapter 5|10 pages

Below-Grade Waterproofing*

chapter 6|8 pages

Reinforcing Steel*

chapter 7|10 pages

Formwork*

chapter 8|8 pages

Concrete Placing and Finishing*

chapter 9|6 pages

Shotcrete*

chapter |4 pages

Questions—Module Two (Chapters 5–9)

chapter |2 pages

Module Three

chapter 10|8 pages

Structural Steel*

chapter 11|4 pages

Metal Decking*

chapter 12|12 pages

Miscellaneous Metals*

chapter 13|8 pages

Expansion Joint Covers*

chapter 14|4 pages

Spray-Applied Fireproofing*

chapter |2 pages

Module Four

chapter 15|6 pages

Above-Grade Waterproofing*

chapter 16|4 pages

Lath and Plaster*

chapter 17|8 pages

Precast Concrete*

chapter 18|4 pages

Masonry*

chapter 19|6 pages

Metal Panels*

chapter 20|8 pages

Roofing*

chapter 21|8 pages

Flashing and Louvers*

chapter 22|6 pages

Glass and Glazing*

chapter 23|8 pages

Caulking and Sealants*

chapter |2 pages

Module Five

chapter 24|8 pages

Framing and Drywall*

chapter 25|4 pages

Building Insulation and Fire Safing*

chapter 26|10 pages

Doors, Frames, and Hardware*

chapter 27|6 pages

Coiling Doors and Grilles*

chapter 28|6 pages

Casework and Millwork*

chapter 29|8 pages

Painting and Wall Coverings*

chapter 30|4 pages

Ceramic Tile and Stone Flooring*

chapter 31|6 pages

Terrazzo and Epoxy Flooring*

chapter 32|6 pages

Acoustical Treatment*

chapter 33|4 pages

Carpeting and Resilient Flooring*

chapter 34|6 pages

Wood Flooring*

chapter |2 pages

Module Six

chapter 35|28 pages

Miscellaneous Specialty Work*

chapter 36|8 pages

Food Service Equipment*

chapter 37|12 pages

Elevators*

chapter |2 pages

Module Seven

chapter 38|12 pages

Plumbing*

chapter 39|10 pages

Fire Sprinklers*

chapter 40|12 pages

Mechanical (HVAC)*

chapter 41|16 pages

Electrical*

chapter |2 pages

Module Eight

chapter 42|6 pages

Site Utilities*

chapter 43|4 pages

Asphaltic-Concrete Paving*

chapter 44|4 pages

Site Concrete*

chapter 45|4 pages

Chain Link Fencing*

chapter 46|4 pages

Landscaping and Irrigation*

chapter |2 pages

Module Nine

chapter 47|14 pages

Subcontractor Scope Issues

chapter 48|8 pages

General Contractor Responsibilities