ABSTRACT

Production is based on the placement of the prefabricated micro-reinforcement and the infiltration of the concrete slurry (Fig. 2).

Between 1 Vol.-% and 10 Vol.-% of microreinforcement are embedded, typically, 6 Vol.-%.