ABSTRACT

For this study the main goals have been set in accordance with the national requirements. Deutscher Ausschus für Stahlbeton (2001) state that by a closure of cracks through grouting or injection and by filling up the spalled concrete volumes the following four objectives should be completed:

1. Closure: prevents corrosive material from entering.