ABSTRACT
The is based on the data and information These data will consist of the thc behavior and and the container and used. Furthermore the required residual moisture content and the time schedule for the process are nnwl,tieci
The main data of the two are summarized in Table I. The of the development is to production with process and
data as recommended for the manufacture of thcse products. The data of the are intended to illustrate the kind of information to
The did not have automatic BTM and DR measurements. The valve between the chamber and condenser was closed and opened The time of closure was measured by a
watch. The pressure rises were recorded on a and eXltrapolal:ed from the pressure at the of The pressure
was measured by a gauge. The relationship between Pc, 1'sh , and is only viable for the plant (lab plant); it will be different for
the pilot plant and most likely also for the production plant.