ABSTRACT

‘Post-contract’ begins as soon as the specification is tendered and quotations are sought. The requirements for the basis of the contract are set out in Chapters 6 and 7. The moment the tender is sent out for quotations, the specifier is faced with the post-contract consequences of what has been sought.