ABSTRACT

For acceptance of new pile types and/or construction techniques, the instrumentation of the piles must comply with the requirements summarized in the guidelines and standards for static load tests. The requirements for the additional transducers must satisfy at least the requirement with respect to accuracy and sample frequency as mentioned in Section 4 of the Standard for RLT.