ABSTRACT

CP 3: Chapter VIII: 1949: Heating and thermal insulation. Conditions affecting temperature in dwellings. Recommends standards of warmth for

rooms. CP 324 and CP 202; 1951: Provision of domestic electric water-heating installations. Design and installation of domestic water-heating systems. CP 332: Selection and installation of town gas space heating. Part 1:1961: independent domestic applicances, selection and installation of radiant or

convector fires. Part 3:1970: boilers of more than 150,000 Btu/h (44kw) and up to 2,000,000 Btu/h

(586kw) output. Part 4:1966: ducted warm air systems. CP 333: Selection and installation of town gas hot water supplies. Part 1:1964: domestic premises. CP 341 and CP 300-307:1966: Central heating by low pressure hot water. Head-code and seven sub-codes covering boilers and calorifiers; storage vessels;

pipework, fittings, valves, taps and cocks; appliances; unit heaters, circulating pumps, and thermal insulation.