ABSTRACT

Early in the preliminary engineering design phase it is important to establish the hydraulic grade line across the plant. This is because both the proper selection of the plant site elevation and the suitability of the site (to accommodate all unit processes requiring specific water elevations and depths of structures) depend on this consideration.