ABSTRACT

Obviously, if the window concerned is above first floor level then a system of scaffolding will be necessary. This was dealt with to some extent in Project 1, but basically the scaffolding should comply with the Construction Regulations (Working Places) and is the total responsibility of the main contractor, in this case the builder carrying out the window replacement. The correct scaffold for the type of work should be constructed.