ABSTRACT

The water level outside the retaining wall of a braced excavation is usually assumed to be the original ground water level but is well known to drop during construction. In this paper, this free surface is evaluated using an iterative finite element analysis proposed by the author and four design graphs are prepared. The water pressure difference on the retaining wall which is probably the greatest design loading on the wall will be examined in details.