ABSTRACT

Prior to the beginning of the concrete placement at Beni Haroun dam, the biggest RCC dam in volume at the time of its construction, a large full-scale trial was performed. The aim of this paper is to make a description of the trial, to give a detailed account of the main objectives sought and, finally, to point out the most important conclusions drawn from the trial that could be applied for the ulterior dam construction.