ABSTRACT

The effectiveness of the combination of three methods (TDEM, TSP, and DRISS) by means of collecting the precise information on the ground ahead of the tunnel face, was estimated through application to tunnel construction projects. As a result, it was found that these methods, when used in combination, can provide higher accuracy than used separately, and can also enable safe and effective tunnel construction.