ABSTRACT

Generally and in normal circumstances, the contractor has no liability for design, therefore no liability for the production of design drawings. The question often arises whether the contractor is entitled simply to build what the drawings and specifications set out, even if there are errors on the architect’s drawing. It is not surprising that most architects would say no, but the case law on this subject is not so clear.