ABSTRACT

The two basic tasks in TBM tunneling, as for any underground excavation, are (i) to excavate and remove the rock and (ii) to maintain tunnel stability until the final lining, if necessary, is installed. Application of rock engineering for TBM drives should be directed towards solving these tasks which define the TBM performance and finally the project delivery time and project economics (Alber, 2001).