ABSTRACT

This paper looks very briefly at the strategic decisions that were made with respect to the contractual aspects of implementing the Marmaray Project. The terms “Employer” and “Contractor” are as used in FIDIC contracts; however, the term “Consultant” is used to refer to the firm employed to assist the Employer.