ABSTRACT

The highly conditioned layout of high-speed railway tracks has led to an increased number of bridges and viaducts that use lower deck structures, due to minimum clearance limits. This is the case of bowstring bridges, where the deck, hanged by two lateral arches, often consists of an orthotropic grid of cross girders and longitudinal stiffeners joined together by a top plate or slab.