ABSTRACT
In the last 20 years, Turkey has built a network of 22 dams, 19 hydroelectric plants, and extensive irrigation systems on the Tigris and Euphrates Rivers, together called the Southeastern Anatolia Project (GAP).
In the last 20 years, Turkey has built a network of 22 dams, 19 hydroelectric plants, and extensive irrigation systems on the Tigris and Euphrates Rivers, together called the Southeastern Anatolia Project (GAP).