ABSTRACT
CLARIFICATION NOTES ON LABOUR
COSTS IN THIS SECTION
In situ concrete team
Generally a three man team is used in this
section; The column ‘Labour hours’ reports team hours. The column ‘Labour £’ reports the total cost of the team for the unit of work
shown
3 man team – 1.00 57.75 – – hr 57.75 2 man team – 1.00 38.50 – – hr 38.50
CONCRETE MIX INFORMATION
General
The concrete mixes used here are referred to
as ‘Designed’, ‘Standard’ and ‘Designated’ mixes.