ABSTRACT

S.P.M.) which could also be integrated with an oil loading system. • Either a decant system to pump off surface water as the solids settled (this would also

have to be able to compensate for the different levels in the hold during the filling phase) and/or a screen and drain system in the bottom of the hold to remove water which percolates through the solids would be required.