ABSTRACT

A last consideration with regard to the aqueduct is the possibility of tunnelling to tap an adjacent catchment area. Tunnelling is likely to be expensive. The minimum practical tunnel diameter is approximately 2m, and the current cost of construction is around £1000000 per kilometre.