ABSTRACT

ABSTRACT: The great evolution of pre-tensioning technology allowed structural engineers to approach the design of bridges in a different way, by using larger and wider spans, in order to reduce global costs and construction periods. The mobile equipments have been following this tendency, and some of them may now be used to build bridges with larger spans, in less time, with lower global equipment costs. This article presents a modern concept of such equipments.