ABSTRACT

ABSTRACT: This paper presents the results of the research on a five-span prestressed concrete road bridge under static load performed at different stages of its repair. All bridge spans reinforce were conducted by CFRP tapes glued on bottom flanges of main beams, and external flat steel stirrups, as well as overlaying a new concrete deck layer.