ABSTRACT

Use the Berezantsev method for estimating Qb. For estimating Qp use Ks = 0.75 and 8= 20°.

15.2 Refer to Problem 15.1. Compute Qb by Meyerhof's method. Determine Q/ using the critical depth concept, and Q

a with F

s = 2.5. All the other data given in Probe 15.1 remain

the same. 15.3 Estimate Qb by Vesic's method for the pile given in Probe 15.1. Assume I, = ITT = 60.