Tractor 4.82 t, 4WD (74 kW) 10.76 hour 10.76 75 9.0 2.0 12.32 32(63)
Tractor (68 HP) c/w 11 Hiab lift 12.43 hour 12.43 75 9.0 2.0 13.99 32(62)
Tractor (68 HP) with front end loading
bucket (0.33 rna) 11.81 hour 11.81 75 9.0 2.0 13.37 37(51)
Tractor (68 HP) with Hydro
seeding equipment 12.56 hour 12.56 75 9.0 2.0 14.12 37(*)
Tractor (68 HP) includes 2 tool
compressor and front end loading
bucket 12.91 hour 12.91 75 10.5 3.5 14.76 - Tractor (68HP) with Fencing Auger 11.74 hour 11.74 75 9.0 3.5 13.33 -
ASPHALT/ROAD CONSTRUCTION
Asphalt pavers
maximum paving width 3.60 m,
24kWengine 20.97 hour 20.97 80 6.2 4.0 22.14 2(1) extending up to 4 m, 35 kW engine 37.71 hour 37.71 80 8.2 5.0 39.28 2(1) maximum paving width 9 m, 80kW
engine 68.37 hour 68.37 80 17.0 3.0 71.55 2(3) Associated equipment
tar sprayer (100 litre) 1.42 hour 1.42 80 9.0 3.0 3.10 29(6) self propelled chip spreader 5.55 hour 5.55 80 9.0 3.0 7.23 2(9) heating iron 1.02 hour 1.02 - - - 1.02 - insulated (20 tonne) tipper (OERV) 18.11 hour 18.11 80 14.0 7.0 26.27 14(18) Aveling Barford 3 point roller 6.76 hour 6.76 80 6.0 7.5 7.93 23(4)
Surface planers, cold plane
planing width 0.5 m, 72 kW 10.40 hour 10.40 80 6.0 5.0 11.54 2(12) planing width 2.1 m, 390 kW 43.33 hour 43.33 80 12.0 5.0 45.62 2(14)
Cost per working hour Hire Hire DSR Rate Period Plant Usage Fuel 011 etc. Total
£ £ " l/hr " fuel £ Surface planers, heat plane
planing width up to 1.0 m
re-mixer 20.80 hour 20.80 80 8.0 3.0 22.30 2(11) planing width up to 4.5 m remixer 64.13 hour 64.13 80 13.0 5.0 66.61 2(-)
Concrete pavers
maximum paving width 6.00 m,
depth 300 mm, 123 kW 60.66 hour 60.66 80 17.0 3.0 63.84 - maximum paving width 12.8 m
depth 500 mm 340 kW 88.39 hour 88.39 80 72.0 3.0 101.86 - Concrete Slipform paver/trimmer
maximum paving width 5 m 72.80 hour 72.80 80 24.0 3.0 77.29 - Slipformed Concrete joint and bar
inserter 8.67 hour 8.67 80 4.0 3.0 9.42 - Concrete Slipform finisher 13.09 hour 13.09 80 9.0 3.0 14.77 -
COMPACTION
Plate compactors
Vibrating compaction plate 64 kg
unit weight 360 mm wide
(petrol) 40.02 week 1.00 85 0.8 3.0 1.50 22(6)
Vibrating compaction plate 140 kg
unit weight 400 mm wide
(petrol) 48.50 week 1.21 85 1.2 3.0 1.96 22(8)
Vibrating compaction plate 180 kg
unit weight 600 mm wide 43.87 week 1.10 85 0.9 3.0 1.28 22(10)
Vibrating compaction plate 345 kg unit weight 600 mm wide 47.38 week 1.18 85 1.2 3.0 1.42 22(12)
Vibrating compaction trench plate
300 mm wide 35.95 week 0.90 85 0.8 3.0 1.06 22(")
Tamper BT58 62 kg (petrol) 40.02 week 1.00 85 0.8 3.0 1.50 22(1)
CLEANERS/SWEEPERS
Front Tractor or Truck mounted
2 m wide (excluding vehicle) 61.77 week 1.54 - - - 1.54 14(36) Towed sweeper diesel engined 92.30 week 2.31 75 4.0 4.0 4.43 - Glutton type mobile gully sucker 11.94 hour 11.94 75 12.0 3.0 18.25 -
Coat per working hour Hire Hire DSR
Rate Period Plant Usage Fuel 011 etc. Total £ £ " l/hr " fuel £
MOBILE COMPRESSORS (SILENCED
OR SUPER SILENCED)
Compressors, single tool
1.80 rna/min, 13 kW 99.84 week 2.50 85 3.2 4.0 3.14 4(1)
Compressors, two tool 2.80 m3/min, 23 kW, two tool 113.43 week 2.84 85 4.5 3.0 3.73 4(2)
3.70 m3/min, 28 kW, two tool 134.05 week 3.35 85 5.9 3.0 4.52 4(3) 4.80 m3/min, 34 kW, two tool 155.12 week 3.88 85 6.8 3.0 5.23 4(4) 7.30 rna/min, 53 kW, two tool 201.88 week 5.05 85 10.2 3.0 7.08 4(6)
Compressors, four tool
11.30 m3/min, 95 kW, four tool 327.55 week 8.19 85 19.0 3.0 11.97 4(8)
15.50 m3/min, 160 kW, four tool 363.95 week 9.10 85 32.0 3.0 15.46 4(9) 16.00 rna/min, 160 kW, four tool 412.47 week 10.31 85 32.0 3.0 16.67 4(9)
18.40 rna/min, 235 kW, four tool 355.29 week 8.88 85 47.0 3.0 18.22 4(10) 22.10 m3/min, 216 kW, four tool 433.28 week 10.83 85 43.0 3.0 19.38 4(11) 25.30 rna/min, 216 kW 519.93 week 13.00 85 43.0 3.0 21.55 4(11)
Reciprocating compressors
up to 4 cfm for small air tools 240v 37.02 week 0.93 85 3.0 3.0 1.53 4(16) up to 9 cfm for small air tools 240v 66.29 week 1.66 85 3.0 3.0 2.26 4(16) up to 13 cfm for small air tools 2401 73.09 week 1.83 85 4.0 3.0 2.62 4(16)
Petrol driven hydraulic power unit
C/W breaker (63 kg) 63.18 week 1.58 85 1.5 3.0 1.88 . Metreater self propelled hydraulic asphalt cutter 98.26 week 2.46 75 9.0 3.0 4.04 . Vehicle compressor Compair
Holman 4rna/min on Ford Transit chassis 8.76 hour 8.76 85 12.0 3.0 11.14 4(15) Bristol MF-4 on International Tractor 9.13 hour 9.13 85 12.0 3.0 11.51 4(*) Bristol MF-4 on International
Tractor with loading bucket 10.24 hour 10.24 85 12.0 3.0 12.62 4(*)
Cost per working hour
Hire Hire DSR
Rate Period Plant Usage Fuel 011 etc. Total £ £ % l/hr % fuel £
COMPRESSOR TOOLS (cw 50 ft/15 m HOSE)
chipping hammer, 0.7 ma/min 30.33 week 0.76 - - - 0.76 30(4) brick hammer/demolition pick,1.4 ma/min 11.26 week 0.28 - - - 0.28 - clay spade,1.6 rna/min 14.73 week 0.37 - - - 0.37 30(3) road breaker, 2.4 ma/min 27.98 week 0.70 - - - 0.70 30(1) hand hammer drill, 0.9 ma/min 32.12 week 0.80 - - - 0.80 3O(*) light rock drill 28, 1.2 ma/min 38.45 week 0.96 - - - 0.96 30(5) medium rock drill 30, 1.5 ma/min 52.99 week 1.32 - - - 1.32 30(6) heavy rock drill 33, 2.4 ma/min 70.52 week 1.76 - . - 1.76 30(7) scabbier 1 head hand, 0.3 ma/min 64.41 week 1.61 - - - 1.61 - scabbier 3 head hand, 0.7 ma/min 77.27 week 1.93 - - - 1.93 · scabbier 5 head trolley, 3.1 ma/min 170.45 week 4.26 - - - 4.26 - scabbier 7 head trolley, 4.5 rna/min 200.04 week 5.00 - - - 5.00 - needle gun/descaler, 0.3 rna/min 41.06 week 1.03 - - - 1.03 30(4) concrete crack cutter, 0.7 ma/min 91.12 week 2.28 - - - 2.28 - rammer, 1.5 ma/min 14.99 week 0.37 - - - 0.37 22(1) air lance, variable valve, 0.3 ma/min 14.47 week 0.36 - - - 0.36 - impact wrench 12 mm drive,
0.4rna/min 33.83 week 0.85 - - - 0.85 - impact wrench 25 mm drive,
0.4ma/min 56.95 week 1.42 . - - 1.42 - trench sheet driver, 2.4 ma/min 73.78 week 1.84 - - - 1.84 - steel post driver (crash barrier),
2.4ma/min 73.92 week 1.85 . - - 1.85 - angle grinder 9", 0.8 ma/min 38.78 week 0.97 - - - 0.97 - disc cutter 12", 1.4 rna/min 48.38 week 1.21 - . - 1.21 - poker vibrator P35 (35 mm), 2.4 ma/min 35.60 week 0.89 - - - 0.89 6(24) poker vibrator P54 (54 mm), 2.4
m3/min 45.00 week 1.13 - - - 1.13 6(24) poker vibrator P70 (70 mm), 2.4 ma/min 52.38 week 1.31 - - - 1.31 6(24) rotary drill, 0.3 ma/min 35.60 week 0.89 - - - 0.89 · extra 50 ft/15 m hose 9.10 week 0.23 - - - 0.23 ·
Cost per working hour Hire Hire DSR Rate PerIod Plant Ueage Fuel 011 etc. Total
£ £ "" I/hr "" fuel £ CONCRETE EQUIPMENT
Poker vibrators
air pokers (see compressor tables) 6(24) 50 mm. petrol 41.70 week 1.04 75 2.0 2.0 2.13 6(21) 50 mm. electric 41.70 week 1.04 - - - 1.04 6(23) 75 mm. diesel 41.70 week 1.04 75 1.5 2.0 1.30 6(22) 75 mm. electric 42.48 week 1.06 - - - 1.06 6(23)
Tampers and screeders
vibrating talnper and handles
(petrol) 59.32 week 1.48 75 2.0 2.0 2.57 6(32) razor-back screeder (per metre) 37.07 week 0.93 75 1.5 2.0 1.19 - double beam screeder (7.6 m
wide) 82.32 week 2.06 75 1.5 2.0 2.32 6(34) Rotary power float (petrol).