ABSTRACT

Clearance gang 1 ganger/chargehand (skll rate 4) 11.41 1 skilled operative (skill rate 4) 10.81 2 unskiled operatives (general) 20.26 1 plant operator (skill rate 3) 13.15 Total Gang Rate! Hour £ 55.83

RESOURCES - PLANT

Clearance 0.8 m3 tractor loader - 50% of time 8.52 8 t lorry with hiab - 25% of time 4.46 4 t dumper - 50% of time 3.18 20 t mobile crane - 25% of time 7.71 compressor. 11.3 m3/min (450 cfm). 4 tool £ 5.58 compressor tools: two brick hammers! picks - 50% of time 0.28 compressor tools: chipping hammer 0.38 compressor tools: medium rock drill 30 0.07 compressor tools: road breaker 0.35 compressor tools: two 15 m lengths hose 0.23 Total Gang Rate! Hour £ 30.77

SITE CLEARANCE

General site clearance open field site 9.91 551.29 305.24 medium density wooded 20.61 1146.53 634.74 heavy density wooded 32.09 1785.17 988.29 urban areas (town centre) 30.60 1702.28 942.49 live dual carriageway 30.60 1702.28 942.49

Demolition of btildlng or structure building; brick construction with timber floor and roof - - -

Unit £ ratet

- m' 4.88

Item Gang Labour hours £

SITE CLEARANCE - continued

TAKE UP OR DOWN AND SET ASIDE FOR AS. USE OA AEMOVE TO STORE OR np OFF SITE Take up or down and set aside fOr r&ouse

precast concrete kerbs and channels 0.02 0.95 precast concrete edgings 0.01 0.71 precast concrete drainage and kerb blocks 0.02 1.18 precast concrete drainage channel systems 0.02 1.18 tensioned single sided corrugated beam safety fence 0.14 7.79 timber post and 4 rail fence 0.08 4.45 bench seat 0.13 7.23 cattle trough 0.16 8.68 permanent boIlard 0.13 7.23 pedesbian crossing Iighl8; pair 0.26 14.46 lighting column including bracket ann and lantern; 5m high 0.56 32.27 lighting column including bracket ann and lantern; 10 m high 0.61 33.93 traffic sign 0.26 14.46 timber gate 0.13 7.23 timber gate 0.13 7.23 stile 0.13 7.23 road stud 0.03 1.45 chamber cover and frame 0.03 1.45 gully grating and frame 0.03 1.45 feeder pillars 0.03 1.45

Take up or down and remove to atore Glf .... precast concrete kerbs and channels 0.02 0.95 precast concrete edgings 0.01 0.71 precast concrete drainage and kerb blocks 0.02 1.18 precast concrete drainage channel systems 0.02 1.18 tensioned single sided corrugated beam safety fence 0.14 7.79

Plant Material Unit

- - m8 8.00 - - m3 0.28 - - m3 8.33 - - m3 4..53 - - m3 4.30 - - m8 3.82 - - m8 7.11 - - m8 28.21 - - m8 105.00 - - m8 57.75 - - m8 47.25 - - m8 57.75

1.56 - m 2..50 1.19 - m 1.11 1.92 - m 3.11 1.92 - m 3.11 4.33 - m 12..12 2.46 - m 8.11 4.n - nr 12..00 5.70 - nr 14..38 4.n - nr 12..00 8.02 - nr 22..48