ABSTRACT

A2 State when the excavation is expressly required to be carried out by hand. A3 State any special de-watering techniques which are expressly required.

Paragraph 5.21 State the Commencing Surface if it is not also the Original Surface. State the Excavated Surface if it is not also the Final Surface.