ABSTRACT
Note M2 of CESMM 1 required temporary structural metalwork to be identified. This was deleted.
Coverage Rules were created clarifying the items of fabrication, erection and site bolts (CI, C2 and C3).
Note M2 of CESMM 1 required temporary structural metalwork to be identified. This was deleted.
Coverage Rules were created clarifying the items of fabrication, erection and site bolts (CI, C2 and C3).