ABSTRACT
The overall duration of the weathering procedure is 2525 hours, about 105 days. Figure 2 shows the weathering equipment with 45 specimen prepared for crack-bridging tests.
The above mentioned test procedures and requirements have been elaborated by Federal Ministry for Traffic (BMV) and the German Society for Reinforced Concrete (DAfStb).