ABSTRACT

Again as far as chloride ingress is concerned, membrane curing was not found to be particularly effective and, similarly to fly ash concrete, was only equal to about 3 days water curing. However, the membranedcured GBS concrete still retained a high degree of resistance to chloride ingress.