ABSTRACT

Instrumentation and Control (I&C) systems are very often subject of probabilistic examination either within separate structural reliability analysis or Probabilistic Safety Assessment of a whole technological complex (e.g. Nuclear Power Plant). Use of programmable components in the design of these systems represents a challenge and utilizes the methods, which have been developed for components with a different behaviour. The typical method used for above mentioned examination is Fault Tree Analysis (FTA) (Vesely et al., 1981). The way of software faults modelling within Fault Trees vary a lot between particular models and there is no generally accepted modelling technique.