ABSTRACT

The A55 Expressway across the island of Anglesey, North Wales (Figure 1) was constructed at a cost of £100 m and opened in March 2001. The scheme was designed by Hyder Consulting and constructed by Carillion-Laing under a Design, Build, Finance and Operate Contract for The National Assembly for Wales.