ABSTRACT

Xie (1998) researched model test and lining reliability of tunnel under unsymmetrical pressure. Chen et al. (2007) also evaluated the stability of the slope related to Hydropower Project (diversion tunnel outlet slope) during slope excavation, reinforcement and under seismic loading and finally, they presented several suggestions that may be helpful to construction of the slope.