ABSTRACT
The strength assessment or evaluation of an existing road bridge becomes
necessary for three main reasons:
1. It is required to carry greater traffic loads than designed for, due to
a general increase in traffic weights (principally from heavy lorries or
trucks), increased traffic densities (with trucks occupying more lanes
than the statutory limits) or from the passage of a single abnormal
vehicle transporting, for example, a piece of heavy equipment.