ABSTRACT

The most recent Schedule is dated July 2011 and is published by the Civil Engineering Contractors Association. Copies may be obtained from:

CIVIL ENGINEERING CONTRACTORS ASSOCIATION 55 Tufton Street London SW1P 3QL Tel: 020 7227 4620 Fax: 020 7227 4621

These schedules identify a number of items that are excluded from the rates and percentages quoted, but should be recovered by the Contractor when valuing his Daywork account. Under normal circumstances it is impractical to accurately value these items for each Daywork event, although certain items can be allowed for by means of a percentage addition. Suggested methods of calculating such additions are included in this section.