ABSTRACT

An epoxy mortar system which is qualified for the post-installation of adhesive anchors and reinforcing bars was used. The product is approved for low installation temperatures. The manufacturer’s product installation instruction (MPII) was obeyed. After curing, the test stand with the prestressed disk springs was mounted. Next, the load was transferred to the bar via a pulling rod and a fixation.