Areas not exceeding 1000m2 – – – – – nr 4800.00
C13 BUILDING FABRIC SURVEY
Surveys
Asbestos surveys
type 3 asbestos survey (destructive testing)
to single storey free-standing buildings
such as park buildings, storage sheds and
the like; total floor area less than 100m2 – – – – – nr 950.00 extra over for the removal only of asbestos
off site to tip (tipping charges only) – – – – – tonne 80.00
C20 DEMOLITION
Demolish existing structures; disposal off
site; mechanical demolition; with 3 tonne
excavator and dumper
Brick wall
112.5mm thick – 0.13 2.60 0.73 3.45 m2 6.78 225mm thick – 0.17 3.25 0.91 6.90 m2 11.06 337.5mm thick – – – 8.75 11.58 m2 20.33 450mm thick – – – 11.66 13.80 m2 25.46
Demolish existing structures; disposal off
site mechanically loaded; all other works
by hand
Brick wall
112.5mm thick – 0.33 6.50 4.16 3.45 m2 14.11 225mm thick – 0.50 9.75 – 6.90 m2 16.65 337.5mm thick – 0.67 13.00 – 11.58 m2 24.58 450mm thick – 1.00 19.50 – 13.80 m2 33.30
Demolish existing structures; disposal off
site mechanically loaded; by diesel or
electric breaker; all other works by hand
Brick wall
112.5mm thick – 0.17 3.25 0.47 3.45 m2 7.17 225mm thick – 0.20 3.90 0.56 6.90 m2 11.36 337.5mm thick – 0.25 4.88 0.70 10.24 m2 15.82 450mm thick – 0.33 6.50 0.94 13.80 m2 21.24
Labour Plant Material Unit
Excluding site overheads and profit £ hours £ £ £ rate £
C20 DEMOLITION – CONT
Break out concrete footings associated
with free-standing walls; inclusive of all
excavation and backfilling with excavated
material; disposal off site mechanically
loaded
By mechanical breaker; diesel or electric
plain concrete – 1.50 29.25 9.90 17.40 m3 56.55 reinforced concrete – 2.50 48.75 13.89 30.68 m3 93.32
Remove existing free-standing buildings;
demolition by hand
Timber building with suspended timber floor;
hardstanding or concrete base not included;
disposal off site
shed 6.0m2 – 2.00 39.00 – 31.95 nr 70.95 shed 10.0m2 – 3.00 58.51 – 57.52 nr 116.03 shed 15.0m2 – 3.50 68.25 – 89.47 nr 157.72
Timber building; insulated; with timber or
concrete posts set in concrete, felt covered
timber or tiled roof; internal walls cladding with
timber or plasterboard; load arisings to skip
timber structure 6.0m2 – 2.50 48.75 – 138.04 nr 186.79 timber structure 12.0m2 – 3.50 68.25 – 193.01 nr 261.26 timber structure 20.0m2 – 8.00 156.00 377.81 204.51 nr 738.32
Demolition of free-standing brick buildings
with tiled or sheet roof; concrete
foundations measured separately;
mechanical demolition; maximum distance
to stockpile 25m; inclusive for all access
scaffolding and the like; maximum height
of roof 4.0m; inclusive of all doors,
windows, guttering and down pipes;
including disposal by grab
Half brick thick
10m2 – 8.00 156.00 155.19 147.39 nr 458.58 20m2 – 16.00 312.00 275.88 189.56 nr 777.44
1 brick thick
10m2 – 10.00 195.00 241.41 294.78 nr 731.19 20m2 – 16.00 312.00 362.21 379.12 nr 1053.33
Cavity wall with blockwork inner skin and brick
outer skin; insulated
10m2 – 12.00 234.09 327.74 409.19 nr 971.02 20m2 – 20.00 390.00 448.58 527.17 nr 1365.75
Labour Plant Material Unit
Excluding site overheads and profit £ hours £ £ £ rate £
Extra over to the above for disconnection
of services
Electrical
disconnection – 2.00 39.00 – – nr 39.00 grub out cables and dispose; backfilling; by
machine – – – 0.56 0.51 m 1.07 grub out cables and dispose; backfilling; by
hand – 0.50 9.75 – 0.51 m 10.26 Water supply, foul or surface water drainage
disconnection; capping off – 1.00 19.50 – 39.00 nr 58.50 grub out pipes and dispose; backfilling; by
machine – – – 0.56 0.51 m 1.07 grub out pipes and dispose; backfilling; by
hand – 0.50 9.75 – 0.51 m 10.26
Demolish existing fence; remove stakes or
grub out posts as appropriate; remove to
stock pile for removal off site (not
included)
Mechanical demolition; clear fence line
chain link fence 1.20-1.50m high – 0.01 0.39 0.65 – m 1.04 closeboard or timber panel fence 1.80m
high – 0.03 0.97 1.19 – m 2.16 Mechanical demolition; Light shrubs or
creepers in chainlinks
chain link fence 1.20-1.50m high – 0.01 0.49 0.83 – m 1.32 closeboard or timber panel fence 1.80m
high – 0.03 1.30 1.60 – m 2.90 Mechanical demolition; heavy shrubs or
creepers bramble and the like requiring
clearance to enable removal
fence 1.20-1.50m high – 0.05 1.95 2.02 – m 3.97 closeboard or timber panel fence 1.80m
high – 0.05 1.95 2.59 – m 4.54 Demolition and site transport by hand; clear
fence lines
fence 1.20-1.50m high – 0.03 1.30 – – m 1.30 closeboard or timber panel fence 1.80m
high – 0.07 2.60 – – m 2.60 Demolition and site transport by hand; light
vegetation and creepers
fence 1.20-1.50m high – 0.05 1.95 – – m 1.95 closeboard or timber panel fence 1.80m
high – 0.13 4.88 – – m 4.88 Demolition and site transport by hand; heavy
shrubs or creepers bramble and the like
requiring clearance to enable removal
fence 1.20-1.50m high – 0.13 4.88 – – m 4.88 closeboard or timber panel fence 1.80m
high – 0.17 6.50 – – m 6.50
Labour Plant Material Unit
Excluding site overheads and profit £ hours £ £ £ rate £
C20 DEMOLITION – CONT
Demolition of Posts and straining posts
Break out straining post; grub out concrete
footings; remove to stockpile on site
single straining post by machine – 0.25 4.88 15.73 – nr 20.61 double straining post by machine – 0.30 5.85 18.37 – nr 24.22 single straining post by hand – 1.00 39.00 – – nr 39.00 double straining post by hand – 1.25 48.75 – – nr 48.75
Break out gatepost; concrete steel or timber;
girth not exceeding 150mm; grub out concrete
footings
by machine – 0.25 4.88 15.73 – nr 20.61 by hand – 1.00 19.50 – – nr 19.50
C50 REPAIRING/RENOVATING/
CONSERVING METAL
Eura Conservation Ltd; conservation of
metal railings; works to heritage
conservation standards
Taking down and transporting existing
metalwork to an off site workshop for
conservation
pair of gates; maximum overall width
4.00m – – – – – pair 596.00 side screens to gates – – – – – pair 485.00 railings; 1.20m high; plain – – – – – m 52.00 railings; 1.80m high; with finials – – – – – m 98.00 ornate cast or wrought iron railings – – – – – m 108.00
Conserving metalwork off site; inclusive of
repairs to metalwork; rust removal, rubbing
down and preparing for re-erection on site
gates; 2.50m high; width not exceeding
4.00m – – – – – m 1100.00 railings; 1.20m high; plain – – – – – m 145.00 railings; 1.80m high; with finials – – – – – m 220.00 ornate cast or wrought iron railings – – – – – m 435.00
Transporting from store and re-erection of
existing gates into locations recorded with
position orientation and features of the original
installation
gates; 2.50m high; width not exceeding
4.00m – – – – – nr 1018.00 Refixing existing railings previously taken
down and repaired on site
railings; 1.20m high; plain – – – – – m 104.00 railings; 1.80m high; with finials – – – – – m 200.00 ornate cast or wrought iron railings – – – – – m 248.00
Labour Plant Material Unit
Excluding site overheads and profit £ hours £ £ £ rate £
Eura Conservation Ltd; supply of
conservation grade railings to match
existing materials on site; inclusive of all
surveys, measurements and analysis of
materials, installation methods and the like
Wavy bar railings
1.20m high; plain – – – – – m 97.00 1.70m high; straight – – – – – m 310.00 1.70m high; curved – – – – – m 375.00 1.80m high; with finials – – – – – m 300.00 ornate cast or wrought iron railings – – – – – m 825.00
Painting of railings: see section M60