ABSTRACT

In this study, the demolition of a shear wall structure apartment was simulated using ELS software. The simulation demonstrated a demolition that combined progressive collapse and felling methods, using an advanced explosive technique to minimize environmental effects on the vicinity of the target structure. The collapse behavior and diffusion area of debris obtained from the simulation results were compared to the experimental results.