ABSTRACT

The general list of all the interventions carried out in this period (627 in total) was used as a starting point, and a selection was made of the interventions on buildings originally executed using the rammed earth technique. 75 files were selected. It should be noted that as direct action on the walls is not carried out in all intervention projects the definitive samples used for this research consist of 68 buildings distributed fairly homogeneously throughout the Spanish

1 INTRODUCTION

1.1 Aim of the research

The main aim of this research is to provide an overall analysis of the interventions carried out on monumental rammed earth architecture in Spain through the Spanish government’s 1% Cultural Programme over the last decade.