ABSTRACT

Dam engineering is currently experiencing a strong revival of labyrinth oriented weirs. Labyrinth weirs, with a repetitive constructional character and an increased specific discharge capacity, are a very good technical-economical compromise. The concept of Piano Key Weir (PKW), with alveoli developed in overhangs from a reduced support area, enabl