ABSTRACT
It was required that the cables adjacent to the tower be then installed and stressed to 25% of the design stress. Working outwards from the tower this process was repeated for each pair of back span and main span cables.
It was required that the cables adjacent to the tower be then installed and stressed to 25% of the design stress. Working outwards from the tower this process was repeated for each pair of back span and main span cables.