ABSTRACT

The article presents the method of realization of the digital deposit model elaboration, which is used in the Polish Mining Group Ltd. (PGG S.A.). The PGG S.A. has used an integrated package of engineering applications: AutoCAD Civil 3D, Oracle Spatial, EDBJ, GEONET and GEOLISP. The most important element of the system is the GEOLISP software, which allows to automate the process of obtaining data that is important for mining operations, in this it allows for the preparation of surveying—geological documentation in a standard compliant with the law. PGG S.A. mines, starting from introducing data from the resource in an analogue form and direct measurements by developing a graphic visualization of the seam, to use the developed deposit model in the implementation of tasks in the company at each stage of mining production. The above is discussed on the example of one of the mining plants owned by PGG.SA.