ABSTRACT

Contemporary construction practice presents a shift in emphasis from thinking about the design team in isolation, to considering the project team as a collaborative whole: client, design team, and contractor.

This approach requires greater consideration of how the project team is procured and assembled – and Assembling a Collaborative Project Team provides a range of in-depth and invaluable methods for ensuring that this essential task is carried out effectively. It will bring a range of benefits to any project – from facilitating BIM-ready teams, to better construction programming, and reducing risk through ensuring a watertight contractual framework. Many of the methods presented here are likely to become ingrained in the way all projects are coordinated.

It shows that the best way of assembling a collaborative team is by establishing the team at the outset in manner that ensures that each party is fully aware of what they need to do and when, and by agreeing how this will be achieved.

chapter |4 pages

Introduction

chapter Chapter 1|8 pages

The importance of Stages 0 and 1

chapter Chapter 2|16 pages

The evolution of the project team

chapter Chapter 3|6 pages

Achieving the best possible start to a project

chapter Chapter 4|6 pages

Assembling the collaborative project team

chapter Chapter 6|18 pages

WHO is in the project team?

chapter Chapter 7|17 pages

WHAT does the project team need to do?

chapter Chapter 9|14 pages

HOW will the project team work together?

chapter Chapter 10|10 pages

Contracts for the collaborative project team