ABSTRACT

In learned article the earth settlements prediction method based on the analysis of geomechanical processes which occurring in the bottomhole of tunnel during its construction through TBM with active face support pressure is proposed. This method based on using of multivariate numerical modelling for solving of complex underground construction mechanics problem in 3D setting with application of interaction scheme and inelastic soil models.