ABSTRACT

The implementation of a production planning and control system that utilizes the data-storing and processing facilities of a modern computer system has had a high priority at NASCO. The system is intended to improve the co-ordination of the material flow for final assembly of heavy vehicles. Very schematically, the problem to be solved is to determine when, what and how much material must be acquired to meet a given production plan.