ABSTRACT

The application of the powerline ampacity system to the economic operation of transmission network, power system stability, and transmission planning is presented in this chapter. The economic load dispatch problem and the optimal power flow problem are presented by consideration of variable transmission line ratings. Results are presented by example of a hypothetical utility generation and transmission network, which clearly demonstrates the economic benefit of operating a power system by utilizing a dynamic powerline ampacity system.