ABSTRACT

Much that is said and written about controlling project costs is about cost measurement, cost analysis and cost reporting. However, although necessary and important, none of those processes deals directly with cost control. Control implies taking action – not dwelling upon costs that have already been incurred. Cost control is not for historians. So this chapter concentrates solely on measures that can, and should, be taken to keep project costs within their budgeted limits.