ABSTRACT

Afterward, the payback period can be calculated and the corresponding connection, capacity and consumption tariff rates are derived.

This chapter also looks at the need for legislation at a national level to improve the conditions in which DC can flourish and increase the benefits, both economic and environmental, at the country level.