ABSTRACT

The specifications will usually also incorporate, either physically or by reference, the principal plans and drawings for the vessel, which will include (at minimum) a General Arrangement Plan. As previously indicated,4 the contract will in the normal course contain provisions defining, in the event of a conflict, the order of precedence between its terms, those of the specifications and the principal plans and drawings.