ABSTRACT

Total Gang Rate/Hour 1.00 52.82 – – - 52.82 Horticultural works gang

1 skilled operative (skill rate 4) 1.00 16.70 – – - 16.70 1 unskilled operative (general) 1.00 15.59 – – - 15.59

Total Gang Rate/Hour 1.00 32.29 – – - 32.29

RESOURCES – PLANT Fencing/Barriers

agricultural type tractor; fencing auger – – 22.90 – - 22.90 gas oil for ditto – – 9.81 – - 9.81 drop sided trailer, two axles – – 0.40 – - 0.40 power tools etc. (fencing) – – 1.29 – - 1.29 Total Rate/Hour – – 34.40 – - 34.40

RESOURCES – MATERIALS All rates for materials are based on the most economically available materials with a minimum waste allowance of 2.5% and supplier's discount of 15%.