ABSTRACT

Gate II [Sturtevant 12]. The two-level subgoal graph (TSG) entry was one of the nondominated entries in the Grid-Based Path Planning Competitions 2012 and 2013. That is, if another entry was faster, it either was suboptimal or required more memory.